SEWRC determine the new Feed-In Tariffs for electricity produced from renewable energy sources. The new FIT is in force from July 1st 2011.
On June 20th 2011 SEWRC in closed session decided to determine the preferential purchase prices for electricity, produced by renewable sources except hydroelectric power plants with installed capacity over 10 MW.
|
After holding a public discussion on pricing and taking in mind the written suggestions and objections of interested parties the Commission took note of some proposals for changes in pricing elements.
The changes made concern mostly the formation of preferential prices for electricity produced from biomass and the creation of three new groups in the photovoltaic power plants.
Preferential prices for electricity produced from Renewable Energy Sources in force from July 1st 2011.
Electricity generated by hydroelectric power plants (HEPP).
- Micro HEPP with installed capacity up to 200 kW - 116.2 Euro/MW
- Low head riverbed, derivative, operating storage and derivative with annual equalizer and net drop up to 30 meters, from 200 to 10 000 kW - 113.9 Euro/MW
- Middle head derivative, operating storage and derivative with annual equalizer and net drop from 30 up to 100 meters, from 200 to 10 000 kW - 95.5 Euro/MW
- High head derivative, operating storage and derivative with annual equalizer and net drop over 100 meters, from 200 to 10 000 kW - 91.5 Euro/MW
- Derivation tunnels with annual equalizer up to 10 000 kW - 135.5 Euro/MW
- Micro HEPP with pumps - 57.3 Euro/MW
Electricity generated by wind power plants.
- Wind power plants operating up to 2250 hours per year - 97.6 Euro/MW
- Wind power plants operating over 2250 hours per year 88.4 Euro/MW
- Wind power plants operating with asynchronous generator and a cage rotor - 70 Euro/MW
Electricity generated by the Sun.
Facade or roof installed photovoltaic power plants
- with installed capacity up to 30 kWp - 309.4 Euro/MW
- with installed capacity up from 30 to 200 kWp - 304.9 Euro/MW
- with installed capacity up from 200 to 1000 kWp - 298.4 Euro/MW
Ground photovoltaic power plants
- with installed capacity up to 30 kWp - 294.7 Euro/MW
- with installed capacity up from 30 to 200 kWp - 290 Euro/MW
- with installed capacity up from 200 to 1000 kWp - 248.2 Euro/MW
Biomass electricity.
- power plants operating on wood waste and scrap resulting from forest clearing with installed capacity up to 5 MW - 130.6 Euro/MW
- power plants operating on wood waste and scrap resulting from forest clearing with installed capacity up to 5 MW, with combined cycle - 144.2 Euro/MW
- power plants operating on wood waste and scrap resulting from forest clearing with installed capacity over 5 MW - 116.1 Euro/MW
- power plants operating on crops waste with installed capacity up to 5 MW - 99.7 Euro/MW
- power plants operating on energy crops with installed capacity up to 5 MW - 95 Euro/MW
- power plants operating through indirect use of biomass from plant and animal substances up to 150 kW - 221.2 Euro/MW
- power plants operating through indirect use of biomass from plant and animal substances from 150 kW to 1 MW - 207.3 Euro/MW
- power plants operating through indirect use of biomass from plant and animal substances from 1 MW to 5 MW - 171.3 Euro/MW
- power plants operating through indirect use of biomass from plant and animal substances, with cogeneration of electricity and heat, from 1 MW to 5 MW - 178.2 Euro/MW
- power plants operating through indirect use of energy from domestic waste up to 150 kW - 134.8 Euro/MW
- power plants operating through indirect use of energy from domestic waste from 150 kW to 1 MW - 129.3 Euro/MW
- power plants operating through indirect use of energy from domestic waste from 1 MW to 5 MW - 124.6 Euro/MW
- power plants operating through indirect use of energy from domestic hydro-sewage waste up to 150 kW - 80.8 Euro/MW
- power plants operating through indirect use of energy from domestic hydro-sewage waste from 150 kW to 1 MW - 67.05 Euro/MW
- power plants operating through indirect use of energy from domestic hydro-sewage waste from 1 MW to 5 MW - 60.9 Euro/MW